MS20DSL Mini Servo w/Servo Saver & Long Lead by Losi

Check Store Availability
Please be aware that pricing and product availability in-store may vary from what’s available online because each store is independently owned and operated.
Losi
LOSB0813
Note: Manufacturer does not allow using discount coupons
Low Price: $26.99
Add To Cart Add to Wish List
In Stock Online!
Usually ships in 24 hours
$1.99 Flat Rate Shipping!
This item is eligible for $1.99 flat rate shipping Learn More
This is a replacement Losi MS20DSL Mini Servo, and is intended for use with the Losi Mini Desert Truck, Desert Buggy, HIGHroller and Short Course truck. This servo features a factory installed Servo Saver, and a Long Receiver Lead wire for added convenience.      

This product was added to our catalog on September 14, 2010