E-flite Mini Convergence 6 Amp ESC (Long Lead)

E-flite Mini Convergence 6 Amp ESC (Long Lead)
Out Of Stock Online
$1.99 flat rate shipping! Learn More
Price: $21.99

Please Log in to receive a notification when this item arrives in stock.

Check Store Availability
Please be aware that pricing and product availability in-store may vary from what’s available online because each store is independently owned and operated.
This is a replacement E-Flite "Long Lead" 6 Amp ESC for the Mini Convergence Electric Airplane. This ESC is also available with regular length leads (EFLA9313).